Industrial Projects

Mega Build is responsible for the management and development of Industrial Parks like Polaris Bosla SME Industrial Park. Mega Build is also managing heavy industrial projects including Egyptian Steel Plants in Beni Suef and Sokhna. Each plant has a production capacity of 830,000 tons/year. Mega Build acted as the owner representative for Egyptian Steel in both projects.

In addition, Mega Build managed the renovation and expansion of more than 200 telephone exchanges operated by Telecom Egypt.

Industrial Projects

Polaris Bosla SME Industrial Park

Polaris Bosla SME Industrial Park

Polaris Bosla SME Industrial Park

image156

IIC Beni Suef Steel Plant

Polaris Bosla SME Industrial Park

Polaris Bosla SME Industrial Park

image157

NPSS Sokhna Steel Plant

Polaris Bosla SME Industrial Park

NPSS Sokhna Steel Plant

image158

QuickTel Mobile Factory

Quicktel Factory, Algeria

NPSS Sokhna Steel Plant

image159

QuickTel Plastic factory

Quicktel Factory, Algeria

Quicktel Factory, Algeria

image160

Quicktel Factory, Algeria

Quicktel Factory, Algeria

Quicktel Factory, Algeria

image161

Remaya Telephone Exchange

Remaya Telephone Exchange

Remaya Telephone Exchange

image162

ONU Telephone Exchange

Remaya Telephone Exchange

Remaya Telephone Exchange

image163

Polaris Bosla SME Industrial Park

  • Now delivering phase 1 which is composed of 56 units
  • Partners of success: 

                      - Polaris (Client) 

                      - TAP (Dr. Tarek Abd El Latif, Master Planner) 

                      - CIC (MEP designer) 

                      - Al Zamil (Steel structure supply and erection) 

                      - Focus (Main Contractor) 

                      - Advanced (MEP Contractor)

image164
image165
image166

IIC Beni Suef Steel Plant

image167

Project Value

  • 3 Billion EGP

Project Duration

  • 24 Months 

Location

  • Beni Suef      

Project in Brief

  • Mega Build studied project contracts, documents, organization and conducted several meetings with project team to assure that the current organization can lead to successful delivery of the project within the allocated time with the highest quality standards according to specs within the budgeted cost

Mega Build's Role

  • Owner representative

Project Status

  • Completed and Operating

IIC Beni Suef Steel Plant

NPSS Egyptian Steel Plant in Ain al sokhna

image168

Project Value

  • 3 Billion EGP

Project Duration

  • 28 Months 

Location

  •  Ain Al Sokhna            

Project Role in Brief

  • Supervision and project management for the construction of Egyptian Steel factory
  • Capacity: 850,000 tons per year
  • Partners in success:
    - Owner: Egyptian Steel
    - Owner Consultant Representative: Mega Build
    - Supplier and Consultant: Danieli
    - Main Contractor: SIAC

Mega Build's Role

  • Owner Consultant Representative

Project Status

  • Completed and Operating

NPSS Egyptian Steel Plant in Ain Al Sokhna

Quicktel Mobile Factory

image169

Project Value

  • 8 Million EGP

Project Duration

  • 8 Months 

Location

  • Cairo        

Project Role in Brief

  • QuickTel is the first company in the Arab world to manufacture mobile and wireless phones. Mega Build was responsible for constructing the mobile factory.

Mega Build Role

  • Designer and Project Manager

Project Status

  • Completed And Operating

Quicktel Plastic factory

image170

Project Value

  • 7 Million EGP

Project Duration

  • 8 Months 

Location

  • Cairo        

Project Role in Brief

  • Remodeling of the old plastic factory and providing it with modern equipments to comply with the new product requirements according to the desired quality standards

Mega Build Role

  • Designer and Project Manager

Project Status

  • Completed and Operating

Quicktel Factory, Algeria

image171

Project Value

  • 10 Million USD

Project Duration

  • 9 Months 

Location

  • Algeria     

Project Role in Brief

  • Design and construction of QuickTel Factory in Algeria to establish presence in Algeria as a rapid growing market in Telecom for QuickTel

Mega Build Role

  • Project Manager

Project Status

  • Completed and Operating

Remaya telephone exchange

image172

Project Value

  • 70 Million EGP

Project Duration

  • 3 Months 

Location

  • Cairo        

Project Role in Brief

  • Installation of 20K switching system including all required environmental, electrical, HVAC and architectural items. Project accomplished in 87 days

Mega Build's Role

  • Project Manager

Project Status

  • Completed and Operating

ONU Telephone Exchange

image173

Project Value

  • 220 Million EGP

Project Duration

  • 45  Days/site

Location

  • 140 Villages     

Project Role in Brief

  • ONU exchanges are small telephone exchanges that contain up to 5000 lines to be installed in 140 sites located all over Egypt.

Mega Build Role

  • Project Manager

Project Status

  • Completed and Operating